Wall Bed 買家完整 Timeline

由 Day 1 WhatsApp 到 Year 10 warranty — 7 個 milestone

EN process guide 完整 master guide

呢個 timeline 列出 wall bed 買家 整個 6-week 旅程 + 之後 10 年保養. 每個 milestone 有: 天藍色 = 你需要做嘅 · 金色 = 我哋負責嘅.

建議: Print 出嚟 keep 喺手, 同設計師 site visit 時 reference. 或 send 比家人 / housemate 大家清楚自己 responsibility.

🔵 You (你需要做) Send 平面圖 / sign 文件 / 安排 access / pay deposit / 通風 / save protocol etc.
🟡 Us (我哋負責) Site visit / 3D render / 屋苑文件 / production / install / annual check / warranty support etc.
1

WhatsApp Enquiry

DAY 1 · FREE

第一次接觸. 你 send 我哋平面圖 + 屋苑名 + 用途 (e.g. 主人房自住 / 細房客房 / 投資房). 我哋 30 分鐘內 reply (business hours).

You

  • WhatsApp +852 4423 7445
  • Send 平面圖 (phone photo OK)
  • Tell us: 屋苑名 + 你/業主 status + 用途

Us

  • 30-min reply confirm feasibility (95%+ OK)
  • Send pricing range estimate
  • Propose site visit slots (next 7 days)
2

Free Site Visit

WEEK 1 · 60 MIN · 0 COMMITMENT

設計師上門 60 分鐘. 30 分鐘 measurement + 30 分鐘 lifestyle discussion. 大部分客戶 site visit 後 1 週內 deposit.

You

  • Be home (or have keys ready)
  • Share: lifestyle / 5y plan / pets / health
  • Walk through outlet positions / ceiling / wall

Us

  • Precision measure (±5mm)
  • Wall structure verification (ultrasonic)
  • Configuration recommendation
  • 0 commitment, 0 charge
3

3D Render + Written Quote

WEEK 1-2 · 48 HOURS · FREE

PDF 包含 3D rendering (open + closed view) + 5 finish 選擇 + 詳細 itemized quote (hardware / frame / mattress / install / add-ons). PROMO-9OFF 已包含.

You

  • Review PDF
  • Request unlimited revisions (free, before deposit)
  • Pick finish

Us

  • 3D rendering (48h delivery)
  • Itemized quote
  • Free revisions before deposit
  • Quote valid 30 days
4

Confirm + 30% Deposit

WEEK 2-3 · 1-7 DAYS

Sign service agreement + pay 30% deposit. 7-day cancellation full refund (production hasn't started).

You

  • Sign agreement (size / config / finish / install date)
  • Sign management authorization letter
  • Pay 30% deposit (FPS / credit card / wire)
  • Tenant: get landlord signature first (we provide template)

Us

  • Process payment
  • Confirm production slot
  • Start preparing management paperwork
  • 1 free revision included before production starts
5

Building Approval (parallel)

WEEK 3-4 · 5-7 WORKING DAYS · WE HANDLE

Private estate: management approval (5-7 workdays, 95% pass). HOS: management + Housing Authority case-by-case (2-5 weeks). HKHA: Building Authority written consent (4-8 weeks, ~30% pass — we do free pre-check).

You

  • Wait (we handle paperwork)
  • Sign authorization if requested

Us

  • Submit construction drawings
  • HKD 10M public liability insurance cert
  • Worker IDs + permits
  • HKD 5,000-10,000 work deposit (refundable)
  • Communicate with management office
6

Production at Kwun Tong

WEEK 4-8 · 4-6 WEEKS

WALLBED KING workshop produces your wall bed. 4 stages: timber cutting → surface finish → SBLM mechanism → QC + 5x cycle test.

You

  • Receive 2-week production photo update
  • Confirm install date 1 week before
  • Receive installer contact 2 days before
  • Book lift access with management (we provide template)

Us

  • FSC plywood cutting (E0 plywood)
  • Water-based paint application
  • SBLM 5x cycle stress test
  • QC + final pre-install check
7

Install Day

WEEK 8 · 4-6 HOURS · ONE DAY

Saturday morning typical. 4-6 hours total: 30 min noisy drilling (anchor bolts), rest pre-fabricated assembly. Sign-off + 70% balance after 5-cycle test.

You

  • Adult home throughout install
  • Provide drinks / bathroom access
  • BB / pet / elderly relocate during 30-min drilling
  • Sign-off after 5-cycle test
  • Pay 70% balance (FPS / credit / wire)

Us

  • Floor protection laid
  • Wall mount + frame install
  • SBLM mechanism + mattress placement
  • Add-ons (sofa-combo / wardrobes / grab bar / etc)
  • 5x cycle stress test
  • 30-min operating training
8

Years 1-10 Warranty + Annual Check

10 YEARS · FREE

SBLM hardware 10y warranty + 5y frame warranty + 1y mattress warranty + free annual onsite check (December reminder via WhatsApp).

You

  • Reply to December WhatsApp reminder
  • Schedule annual check (1-hour onsite)
  • Use bed properly (don't overload, follow training)
  • Notify us if any issues (loose / stuck / oil leak)

Us

  • Free annual hardware check + oiling
  • Free fix for warranted issues
  • Bolt tightness verification
  • Re-train new occupants if requested

Ready to start? WhatsApp Day 1 now

+852 4423 7445

相關閱讀

📍 IN-PERSON ONLY · 30 MIN · FREE

Want to actually see one before deciding?

Tap to book a 30-min Kwun Tong showroom viewing. Try the mechanism. Test the mattress. Ask anything. We don't take deposits at the showroom — no pressure.

💬 Book Kwun Tong Viewing — WhatsApp +852 4423 7445

Mon–Sat 10:00–18:00 HKT · Bot replies instantly · Human within 30 min