牆床同裝修配合時間表 | Wall Bed Renovation Timeline
香港裝修同訂造牆床點樣完美配合?本文為你拆解由設計到安裝嘅時間規劃,避免工程延誤同額外成本。以下建議基於我哋合作夥伴WALLBED KING嘅典型項目經驗。
Planning a Hong Kong renovation with a wall bed? This timeline guide helps coordinate carpentry work with wall bed installation, avoiding delays and extra costs. Recommendations are based on our manufacturing partner WALLBED KING's typical projects.
1. 裝修前2個月 | 2 Months Before Renovation
先決定牆床款式同功能需求:
- 單人床(90cm)/雙人床(120-150cm)/多功能組合(書枱+儲物)
- 電動升降/手動操作/側翻式設計
- 需預留嘅周邊空間(打開時至少留80cm通道)
Key decisions to make:
- Single (90cm)/Queen (120-150cm)/Multi-functional (desk+storage)
- Motorized/Manual/Side-fold mechanism
- Clearance space (minimum 80cm when deployed)
2. 裝修前1個月 | 1 Month Before Renovation
必須完成以下步驟:
- 預約WALLBED KING師傅上門度尺(建議水電完工後)
- 確認牆身結構(混凝土牆/間牆磚/鋼架)
- 與裝修師傅協調電位(電動型需預留插座)
Critical steps:
- Book WALLBED KING's site survey (after rough-in works)
- Verify wall structure (concrete/partition/steel frame)
- Coordinate power points with electricians (for motorized units)
3. 裝修期間配合 | During Renovation
時間對照表:
| 裝修階段 | 牆床跟進 |
|---|---|
| 泥水完工後 | 最終確認尺寸 |
| 油漆前 | 完成所有牆身加固 |
Coordination timeline:
| Renovation Phase | Wall Bed Action |
|---|---|
| After tiling | Final measurement |
| Before painting | Complete wall reinforcement |
4. 安裝時間 | Installation Period
典型所需時間:
- 基本手動款:1日(連同衣櫃組合需1.5日)
- 電動升降系統:1.5-2日(需配合電工測試)
- 注意:舊樓可能需要額外結構評估
Typical duration:
- Basic manual unit: 1 day (1.5 days with wardrobe)
- Motorized system: 1.5-2 days (with electrician coordination)
- Note: Older buildings may require structural assessment
需要具體時間規劃建議?WhatsApp我哋裝修顧問 +852 4423 7445(由WALLBED KING處理製造及安裝)
Need personalized timeline advice? WhatsApp our consultants at +852 4423 7445 (manufacturing & installation by WALLBED KING)