牆床同裝修配合時間表 | Wall Bed Renovation Timeline

香港裝修同訂造牆床點樣完美配合?本文為你拆解由設計到安裝嘅時間規劃,避免工程延誤同額外成本。以下建議基於我哋合作夥伴WALLBED KING嘅典型項目經驗。

Planning a Hong Kong renovation with a wall bed? This timeline guide helps coordinate carpentry work with wall bed installation, avoiding delays and extra costs. Recommendations are based on our manufacturing partner WALLBED KING's typical projects.

1. 裝修前2個月 | 2 Months Before Renovation

先決定牆床款式同功能需求:

Key decisions to make:

2. 裝修前1個月 | 1 Month Before Renovation

必須完成以下步驟:

Critical steps:

3. 裝修期間配合 | During Renovation

時間對照表:

裝修階段 牆床跟進
泥水完工後 最終確認尺寸
油漆前 完成所有牆身加固

Coordination timeline:

Renovation Phase Wall Bed Action
After tiling Final measurement
Before painting Complete wall reinforcement

4. 安裝時間 | Installation Period

典型所需時間:

Typical duration:

需要具體時間規劃建議?WhatsApp我哋裝修顧問 +852 4423 7445(由WALLBED KING處理製造及安裝)

Need personalized timeline advice? WhatsApp our consultants at +852 4423 7445 (manufacturing & installation by WALLBED KING)

```

繼續睇 — More on HK wall beds


Wallbed by Design 窩居·家 是 WALLBED KING (HK) 之市場推廣及諮詢夥伴。詳見 合作關係披露

📍 IN-PERSON ONLY · 30 MIN · FREE

Want to actually see one before deciding?

Tap to book a 30-min Kwun Tong showroom viewing. Try the mechanism. Test the mattress. Ask anything. We don't take deposits at the showroom — no pressure.

💬 Book Kwun Tong Viewing — WhatsApp +852 4423 7445

Mon–Sat 10:00–18:00 HKT · Bot replies instantly · Human within 30 min

→ How booking works (full details) · 中文版