🛡️ 香港唯一有
10年可轉讓保養
嘅牆床 · 美國 SBLM 專利機構 · 香港唯一代理 · 了解條款 →
文章 Lookbook Sizer
📊 Compare options · ❓ FAQ · 🛡 Trust scorecard · ⭐ AS SEEN ON HK TV

HK 新樓收樓入伙 — wall bed install 時序

Coordinate handover · inspection · renovation · wall bed install across 6-10 weeks.

2026-05-06 · 7 min read · by Wallbed by Design 牆床·度身設計

📌 一句結論

HK 新樓 typical timeline: 收樓 (Day 0) → 驗樓 (1-2 週) → reno (4-8 週) → wall bed install (1 日, 7 日 after reno wall finish dry). 想 minimize total time + cost, plan all 4 phases parallel + 預先 WhatsApp 我哋 site visit during 驗樓 phase.

香港新樓買家收樓後嘅典型流程混亂:renovator 同你接觸早期,但通常唔提 wall bed timeline. 我哋每月 receive 5-8 個收樓後客戶 enquiries — 多數 timeline 已經 tight or sequential mistakes. 呢頁解釋 4 phase coordination 同 budgeting.

4 個 phases timeline

1

收樓 (Handover)

Day 0-7

業主 receive keys + property doc + 業主立案法團 onboarding. Standard HK 新樓 handover process:

⚡ Action item: WhatsApp +852 4423 7445 with handover date — we book your provisional site visit slot.
2

驗樓 (Inspection)

Day 7-21

Hire 驗樓師 (HKD 2,500-4,500) to identify defects. Standard inspection items + wall bed-specific:

⚡ Action item: WhatsApp 驗樓師 confirm 結果 + send floor plan + wall photos. We confirm wall bed feasibility within 24 hr.
3

Renovation (with wall bed coordination)

Day 21-49 · 4 wks

Reno 需要 4-6 週 typical. Wall bed integration during reno = lowest cost + cleanest finish.

⚡ Action item: Confirm wall bed production schedule aligns with reno completion. We send updates weekly.
4

Wall bed install

Day 50-56 · 1 day

4-6 hr install. Renovator 預留嘅 wall mounting points 同 finish 配合 → seamless install.

⚡ Action item: Move in date YOUR choice — wall bed ready since Day 50.

Total timeline: 6-10 weeks

PathTotal timeCost difference
Sequential (reno first, wall bed after)10-12 weeks+HKD 4-8k retrofit
Parallel (recommended)6-8 weeksNo extra cost
Priority queue + parallel4-6 weeks+HKD 2,000 rush

2 個 HK 新樓收樓案例

🔑 案例 ① — 日出康城 2024 收樓

320 sqft 1-BRTotal 7 weeksHKD 37,600 wall bed

業主 2024 年 1 月收樓. Day 8 驗樓 + WhatsApp 我哋. Day 14 site visit + 3D rendering. Day 21 confirm + 30% deposit. Reno 4 weeks (parallel wall bed production). Day 49 reno complete. Day 50 wall bed install. Day 52 move in.

Total: 52 days from handover. Renovator coordinated wall bed mounting points = perfect finish, zero rework.

🔑 案例 ② — 峻巒 2024 收樓 + 多 wall bed

650 sqft 2-BRTotal 9 weeksHKD 87,000 wall bed × 2

新婚夫婦收樓 + 同步 reno + 客廳 Queen sofa-combo + 第二房 Single XL + desk. 2 個 wall bed parallel install on Day 56 (1.5 days). Renovator handled BOTH wall mounting points during reno. Total 9 weeks from handover to move in. HKD saving: 估算 HKD 6k vs sequential install.

Multi-vendor coordination

新樓收樓嘅 vendor coordination 通常 include:

🤝 Multi-vendor master Gantt chart

If you're our customer, we send a master Gantt chart showing all vendors aligned across 6-10 weeks. You can forward to renovator + 驗樓師 + mover for sync. Free service for 新樓收樓 customers.

新樓收樓緊?我哋幫你 plan timeline

WhatsApp 我哋你嘅收樓日期 + estate name. 我哋 prepare 個人化 6-10 週 Gantt chart + recommended renovators + wall bed feasibility audit.

+852 4423 7445

FAQ

收樓後幾耐可以裝 wall bed?

收樓 → 驗樓 → reno → wall bed 4 個 phases 需要 6-10 週 sequential. Wall bed 必須 wait reno (主要係 wall finish + flooring) 完成至少 7 日先入場安裝 — wall paint dry · floor protection ready. 我哋 30+ HK renovators 合作經驗, 可以同你 renovator coordinate timeline.

驗樓階段需要 check 邊啲 wall bed-related items?

驗樓 (1-2 週 post-handover) 我哋建議 specifically check: (1) wall structure (concrete / 厚度 / 完整) where you plan wall bed, (2) ceiling height (≥ 2.4m for vertical), (3) AC + electrical positions (no conflict with wall bed footprint), (4) any cracks / unevenness in target walls, (5) noise reading from neighbor walls (acoustic baseline). 我哋免費 send checklist if you 預先 WhatsApp 我哋.

如果 reno 同 wall bed 同 batch 是否最 cost-effective?

係. Reasons: (1) Renovator 預留 wall mounting points + 牆內藏電掣 (LED 床頭燈 etc) = save HKD 2-4k retrofit cost; (2) Wall finish 統一 (paint colour, texture); (3) 共用 mgmt approval paperwork (1 application covers all); (4) Coordinate floor protection (1 set vs 2 separate phases); (5) Single move-in date - 唔需要等 wall bed install 後再 reno minor. Total saving HKD 4-8k vs sequential.

新樓 developer warranty + wall bed warranty 有 conflict 嗎?

無 conflict. Developer warranty 通常 cover 結構性 + plumbing + waterproofing 6 個月 - 7 年 (item-specific). Wall bed install 唔 affect developer warranty (except 我哋 anchor 喺 wall — developer 嘅 wall warranty 仍然 valid 因為冇結構 damage). 我哋 install 前 WhatsApp confirm 你嘅 developer warranty terms 唔 conflict.

相關文章

📍 IN-PERSON ONLY · 30 MIN · FREE

Want to actually see one before deciding?

Tap to book a 30-min Kwun Tong showroom viewing. Try the mechanism. Test the mattress. Ask anything. We don't take deposits at the showroom — no pressure.

💬 Book Kwun Tong Viewing — WhatsApp +852 4423 7445

Mon–Sat 10:00–18:00 HKT · Bot replies instantly · Human within 30 min

→ How booking works (full details) · 中文版

💬WhatsApp 📞4423 7445 📋Free quote
Also available from us: TST training room rental — from HK$700/2h