The Wall Bed Process — From First WhatsApp to Year-10 Warranty

Every step explained. Print it, bring it to any HK vendor visit, score each one against the same checklist. Total elapsed time: 6-12 weeks initial install + 10-year warranty period.

中文版: /process-end-to-end-zh

TL;DR — what to expect

The 8 stages, in order

Stage 1Day 0 — first contact

Initial inquiry (5-10 min)

Two ways: (a) WhatsApp directly with district + flat size, or (b) fill our 60-second quote form which builds a structured WhatsApp message with all the right info. Both work; the form takes the same time but produces a better quote because all fields are populated.

What you get: WhatsApp reply within 24 hours (HK business hours often 2-4 hours) with: ballpark price range, lift/access feasibility check, 2-3 most-relevant case studies for your situation.
Ask any vendor: Will you give me a price range BEFORE the showroom visit? (We do; many vendors refuse and force the showroom visit first.)
Stage 2Day 1 – Day 7

Showroom visit (30 minutes, free, no pressure)

Visit our Kwun Tong showroom (駱駝漆大廈三期 4E, Hoi Yuen Road) at your scheduled time. You'll:

What you leave with: a printed (or PDF emailed) quote-feasibility memo with 3 likely-config options for your flat + price range per option.
Ask any vendor: Can I see the mechanism's patent number? Can you load-test it in front of me with 200kg? (We do both. Many vendors can't.)
Red flag (any vendor): showroom visit feels like sales pressure, vendor refuses to share material brand names, no live load test offered.
Stage 3Day 3 – Day 14

Site survey + final quote (1-2 hours, free)

Once you've confirmed interest, we visit your flat for a site survey. We measure:

If you're remote (e.g. expat pre-arrival from Singapore), we do this via video call + your photos. Same accuracy.

What you get within 3 working days: a fully itemised written quote (not a verbal estimate). Lines include: frame + mechanism, mattress, finishes, hardware, structural reinforcement (if any), install labour, management approval (if applicable), warranty terms, payment schedule, lead time. Total breakdown to the HKD.
Ask any vendor: Can you give me an itemised written quote? Can I see your contract template before I commit anything? (We send both proactively.)
Red flag (any vendor): verbal-only quotes, "we'll figure out the price as we go", no written contract template, demands 50%+ upfront.
Stage 4Day 7 – Day 21

Service agreement + 30% deposit

You sign our standard 1-page customer contract via DocuSign (or paper if you prefer). Contract includes:

Payment options: FPS (instant), bank transfer (3-5 working days), corporate AP (Net 30/60), international wire transfer (4 working days clearance for expats arriving from overseas).

What you get: a signed copy of the contract + 7-day cooling-off receipt + your project number for tracking.
Ask any vendor: What's your refund policy if I cancel after deposit? Can I see your standard contract before committing? (Ours is publicly published at /contract-template-en.)
Red flag (any vendor): no written contract, refuses to publish contract template, demands cash-only deposit, no cooling-off period, deposit "non-refundable for any reason".
Stage 5Week 2 – Week 8

Production in our Kwun Tong workshop (4-6 weeks)

Manufacturing happens in our Kwun Tong workshop. Standard timeline:

ComponentLead timeNotes
Frame manufacturing3-4 weeksCNC-cut to your wall dimensions
SBLM mechanism2 weeksImported from US (if not in current stock)
Häfele hardware2-3 weeksImported from Germany
Custom finishes (oak, walnut, lacquer)+1-3 weeksIf non-standard finish chosen
Structural reinforcement (if applicable)+0.5 weekSteel plate + AP/RSE engineer cert
Mattress1 weekHK-sourced 200mm pocket-spring

During production, we send you 2 photo updates: at frame-built stage (week 3) and at finishing stage (week 5-6). You can request a workshop visit if you want to inspect mid-production (~30 min).

Pre-arrival expat workflow: if you're not in HK yet, we run production in parallel with your arrival timeline. Install is scheduled for the Wed/Thu of your arrival week — bed is ready 3 days after you land.

What you get: 2 photo updates + a confirmed install date 1 week before scheduled day.
Ask any vendor: Can you send me production updates? Can I visit the workshop? (We do both freely.)
Red flag (any vendor): opaque production stage, no photo updates, "trust us, it's being made", workshop address not disclosed.
Stage 6Install day

Install + handover (4-7 hours, plus 30 min handover)

Crew arrives at your flat at the agreed time (typically 9am or 1pm to fit lift access windows). Standard install:

Handover is critical — we run through the 15-item checklist with you, train you on safe deployment + retraction, leave you the warranty document + maintenance card. You sign off, we receive the 70% balance via FPS, you receive the 10-year warranty certificate.

What you get: installed wall bed, signed 15-item handover checklist, warranty certificate (electronic + paper), maintenance card, our 24-hour emergency hotline.
Ask any vendor: Do you have a written handover checklist? Will you train me on safe operation? (Both yes for us.)
Red flag (any vendor): install crew leaves without walkthrough, no written handover, vendor demands full balance before bed is fully tested, no emergency contact provided.
Stage 7Day 30 — first checkup

30-day check-in (5-min WhatsApp, free)

30 days after install, we WhatsApp you a quick check-in: any unusual noises? Mechanism feels smooth? Mattress comfort OK? Any post-install settling-in issues?

If anything's off, we schedule a free service visit within 1 week. Common 30-day issues (rare but solvable):

What you get: peace of mind that the install is settled and warranty period is rolling smoothly.
Ask any vendor: Do you do post-install check-ins? (Most don't. We do.)
Stage 8Year 1 – Year 10

Annual maintenance + warranty period

Year 1 to year 10 of ownership:

What's NOT covered:

What you get: 10 free annual maintenance visits over the warranty period, plus emergency response within 24 hours for any mechanism failure.
Ask any vendor: Is the warranty transferable to the next flat owner? What's the average response time for warranty claims? (Both: yes, transferable; 24-hour response.)
Red flag (any vendor): warranty is verbal only, no annual checkup included, "we'll address issues case-by-case", warranty becomes void if you sell flat, no published response time SLA.

How we compare to typical HK wall bed vendors

Typical HK vendor

  • Verbal price range, full quote only after showroom visit
  • Verbal warranty, no written terms
  • 50-100% deposit demanded upfront
  • Cash-only payment requests
  • No written contract; "we work on trust"
  • No published materials provenance
  • Showroom visit feels like sales pitch
  • Production opaque; no photos until delivery
  • Install crew leaves without walkthrough
  • No annual maintenance
  • Warranty void on flat sale

Wallbed by Design

  • Price range given pre-showroom via WhatsApp
  • 10-year written warranty + transferable
  • 30/40/30 staged payment, all by FPS / wire
  • FPS / bank transfer / corporate AP / international wire — no cash
  • Public 1-page contract template
  • Component-by-component materials provenance
  • Showroom visit = product demo + load test, no sales pressure
  • 2 photo updates during production + workshop visit available
  • 15-item handover checklist signed with you on install day
  • Free annual maintenance visit, year 1-10
  • Warranty fully transferable to next flat owner

Note: not every HK vendor matches the "typical" pattern above. Some are excellent. Use this checklist to identify which is which. We publish our criteria publicly precisely so you can hold us to them — and apply the same questions to any vendor you're considering.

The 8 critical buyer questions (print + take to any vendor visit)

  1. Can I see the mechanism's patent number + brand name?
  2. What's the load rating (static + dynamic)?
  3. What's your written warranty period? Is it transferable on flat sale?
  4. What's your payment schedule? (30/40/30 is industry-standard; anything else, ask why)
  5. Can I see your standard contract template BEFORE I commit?
  6. What's your installation lead time? Can you give me a written ETA?
  7. Do you provide a written handover checklist on install day?
  8. What's your warranty response time for emergencies? Is there an SLA in writing?

Score each vendor 1-10 against these 8 criteria. We publicly score 8/8 (each answer linked above). Apply the same standard to anyone you're considering.

Ready to start Stage 1?

WhatsApp us your district + flat size, or fill the 60-sec form. We reply within 24 hours.